Jenn-Air W10274316B, LI3UNB Installation Instructions, Electrical Requirements, Prepare Location

Models: LI3UNB W10274316B

1 32
Download 32 pages 54.54 Kb
Page 8
Image 8
Electrical Requirements

Electrical Requirements

Observe all governing codes and ordinances.

Ensure that the electrical installation is adequate and in conformance with National Electrical Code, ANSI/NFPA 70 (latest edition), or CSA Standards C22.1-94, Canadian Electrical Code, Part 1 and C22.2 No. 0-M91 (latest edition) and all local codes and ordinances.

If codes permit and a separate ground wire is used, it is recommended that a qualified electrician determine that the ground path is adequate.

A copy of the above code standards can be obtained from:

National Fire Protection Association

1 Batterymarch Park

Quincy, MA 02169-7471

CSA International

8501 East Pleasant Valley Road

Cleveland, OH 44131-5575

A 120 volt, 60 Hz., AC only, 15-amp, fused electrical circuit is required.

If the house has aluminum wiring, follow the procedure below:

1.Connect a section of solid copper wire to the pigtail leads.

2.Connect the aluminum wiring to the added section of copper wire using special connectors and/or tools designed and UL listed for joining copper to aluminum.

Follow the electrical connector manufacturer's recommended procedure. Aluminum/copper connection must conform with local codes and industry accepted wiring practices.

Wire sizes and connections must conform with the rating of the appliance as specified on the model/serial rating plate. The model/serial plate is located behind the filter on the rear wall of the range hood.

Wire sizes must conform to the requirements of the National Electrical Code, ANSI/NFPA 70 (latest edition), or CSA Standards C22. 1-94, Canadian Electrical Code, Part 1 and C22.2 No. 0-M91 (latest edition) and all local codes and ordinances.

INSTALLATION INSTRUCTIONS

Prepare Location

It is recommended that the vent system be installed before hood is installed.

If you are installing the optional backsplash with shelves for heat lamps, follow the instructions included with that product.

Before making cutouts, make sure there is proper clearance within the ceiling or wall for exhaust vent.

Check that all installation parts have been removed from the shipping carton.

1.Disconnect power.

2.Determine which venting method to use: roof or wall exhaust.

3.Select a flat surface for assembling the range hood. Place covering over that surface.

INSTALLATION INSTRUCTIONSWARNING

Excessive Weight Hazard

Use two or more people to move and install range hood.

Failure to do so can result in back or other injury.

4.Using 2 or more people, lift range hood onto covered surface.

Range Hood Mounting Screws Installation

The hood is attached to the wall with the wood support that is attached to the back of the hood.

1.Determine and mark the centerline on the wall where the canopy range hood will be installed.

2.Select a mounting height between a minimum of 30"

(76.2 cm) and a suggested maximum of 36" (91.4 cm), above the cooking surface and the bottom of the range hood and mark a horizontal reference line on the wall.

3.Remove the wood support from the back of the range hood by loosening the 2 screws from the inside. Locate and level the top of the wood support 15³⁄₈" (39.1 cm) above the marked horizontal line and centered on the vertical centerline. Using 2 - 4 of the 6 x 80 mm screws, install wood support so that it is screwed into at least 2 vertical studs.

15³⁄₈"

 

(39 cm)

A

30" (76.2 cm) to 36" (91.4 cm)

B

A. Wood support

B. Centerline

NOTE: The screws provided for mounting this hood must be fastened into solid wood. Do not fasten into sheet rock only.

8

Page 8
Image 8
Jenn-Air W10274316B, LI3UNB installation instructions Installation Instructions, Electrical Requirements, Prepare Location