Figure 11.
CORNER INSTALLATION
45° Elbow
Standard
HORIZONTAL
TERM. CAP
Max. Horizontal Run into a STANDARD HORIZONTAL CAP : 45° elbow + 9” + 6” sections (totalling 17” horizontal).
12” Maximum horizontal when installing the stove with a 1 ft. verticalthe stove.directly2off the rear of
12” MINIMUM vertical rise when installing a 90° elbow directly off the rear of the stove
Termination
Centerline off 1 ft. rise and two 90° elbows
= 38 1/4”
(97.55 cm)
WALL THIMBLE required in all installations passing through combustible
wall.
Figure 12. A vertical run in a
Wall Shield Installation
The decorative Wall Shield, included with the Nordic QT, is used to cover the vent hole in the wall in installations vented directly off the rear of the stove. Follow this procedure:
1.Remove the top two 1/4” hex head screws from the rear shroud of the stove.
2.Align the holes in the wall shield with the holes in the rear shroud.
3.Secure the wall shield to the stove with the two 1/4” hex head screws. See fig. 13.
Figure 13.
Wall Shield installation.
| 21/2” |
12 ” | 64mm |
3053”
mm 76mm
Figure 14. Termination
Clearance to overhangs
11