Operating instructions | KM 100/100 R / KM 100/100 R P | English |
!Slide the new main brush into the main brush box and slip it onto the drive peg
Notes:
—Pay attention to the position of the bristle set when installing the new main brush!
—The bowden cable is to be adjusted so that the main brush is raised approx. 10 mm from the floor.
!Follow the instructions in reverse to mount the main brush rocker arm
!Screw on side panelling
!Insert the swept material container
Adjusting and replacing sealing strips
!Stand sweeper on a flat surface
!Raise the sweep roller
!Turn key switch to "0" and remove key
!Secure the machine against rolling away using a wedge
!Remove the debris container from both sides of the unit
!Screw off side panelling on both sides
!Unscrew front screw of side panelling
!Unscrew rear screws of side panelling
Front sealing strip
!Slightly loosen fastening nut at the front sealing strip, unscrew it to replace it
!Screw on new sealing strip but do not yet tighten nuts
!Align the sealing strip
!Set the sealing strip’s clearance to the floor so that it bends backwards with a lag of
35 - 40 mm
!Tighten nuts
Rear sealing strip
!The floor clearance of the sealing strip is set so that it bends backward with a lag of
5 - 10 mm
!Replace if worn
!Dismantle the sweeping drum
!Unscrew fastening nuts of the rear sealing strip
!Screw on new sealing strip
Side sealing strips
!Slightly loosen fastening nuts of the side sealing strip, unscrew them to replace it
!Screw on new sealing strip but do not yet tighten nuts
!In order to set the clearance to the floor slide in the 1 - 2 mm spacer
!Align the sealing strip
!Tighten nuts
!Screw on side panelling
!Insert the swept material container
29