Keating Of Chicago installation manual Placing Miraclean Griddle In Operation

Models: Miraclean

1 17
Download 17 pages 1.52 Kb
Page 5
Image 5
ASSEMBLY INSTRUCTIONS FOR GRIDDLE

ASSEMBLY INSTRUCTIONS FOR GRIDDLE

STAND ON CASTERS

(THERE IS NO TOP ON THIS STAND)

PLACING MIRACLEAN®

GRIDDLE IN OPERATION

(When all previous instructions have been completed). Check the serial plate to determine if the burner is set up for the proper type gas before connecting the quick- disconnect or piping from the building gas supply pipe.

a. Gas pressure at manifold NATURAL GAS – 4.0 in. W.C.

b. Gas pressure at manifold

LP GAS – 10 in. W.C. (2.49kPa). c. Maximum incoming gas pressure

NATURAL GAS – 7 in. W.C. (2.01kPa). d. Maximum incoming gas pressure

LP GAS – 11 in. W.C. (2.98kPa). 1. Connect incoming gas.

3

Page 5
Image 5
Keating Of Chicago Placing Miraclean Griddle In Operation, Assembly Instructions For Griddle Stand On Casters