![](/images/new-backgrounds/1198880/19888023x1.webp)
L | gl e s |
Check the levelness of the dryer. Check levelness first side to side, then front to back.
1.To protect the floor, use a large flat piece of cardboard from the dryer carton. Place cardboard under the entire back edge of the dryer. See illustration.
2.Firmly grasp the body of the dryer (not the console panel). Gently lay the dryer on the cardboard.
If the dryer is not level, prop up the dryer using a wood block.
Use a wrench to adjust the legs up or down and check again for levelness.
NOTE: It might be necessary to level the dryer again after it has been moved into its final position.
3. | Examine the leveling | legs. | Find the diamond | marking. | |
4. | Screw the legs | into the leg | holes by hand. Use a wrench to | ||
| finish turning the legs | until the diamond marking is no longer | |||
| visible. |
|
|
|
|
5. | Place a carton | corner | post | under each of the | 2 dryer back |
Make Gas Oo s 'ecsL
1.Remove the red cap from the gas pipe. Move the dryer close to its final position.
2.Using a wrench to tighten, connect the gas supply to the dryer. Use pipe joint compound on all
NOTE: For L.R gas connections, you must use pipe joint
compound resistant to the action of L.R gas. Do not use TEFLON _t tape.
A combination of pipe fittings must be used to connect the dryer to the existing gas line. Shown following is a recommended connection. Your connection may be different, according to the supply line type, size and location.
corners. Stand the dryer up. Slide the dryer on the corner | |
posts until it is close to | its final location. Leave enough room |
to connect the exhaust | vent or gas line. |
6. Once connection is made and dryer is in final location, | |
remove corner posts and cardboard. |
For mobile home use
Gas dryers must be securely fastened to the floor at the time of installation.
!
B\
A. %" flexible gas connector
B. %" dryer pipe
C. %" to %" pipe elbow
D. %"
C
Mobile home installations require a Mobile Home Installation Kit. For more information, please reference the service numbers located on the back page of this manual.
3.Open the shutoff valve in the supply line. The valve is open when the handle is parallel to the gas pipe.
A. Closed valve
B. Open valve
4.Test all connections by brushing on an approved noncorrosive
leak. Correct any leak found.
12