30.InstallLid,Overlay,Handle,CookingGrid,WarmingRack,HingeClip,andLogo.
Installlidbeforeinstallingoverlay,logo,andtemperaturegauge.
1.Installlidandhingeclipasshown.
2.Placeoverlayontopoflid
3.Attachlogo
NOTE: Tighten wing nuts
securely.(Do not overtighten)
5.Install temperature gauge.
6.Place handle ends into handle tube as shown
Note: Notches in handle tube mate with tab inside handle cap as shown
End
_andle
Handle
Tube
4. Secure overlay with
(2) # 6 wingnuts.
..... ®
Warming
Note: Keep handle tube aligned with end caps at all times.
Cooking Grids
7. Then place handle assembly onto lid and secure with washers and #10 wingnuts.
8. Install cooking grids and warming rack as shown.
21