Figure 5: Recommended Piping for Basic Installation
I_o n o_1
oo
Water Heater
Equipment ListQTY
Water Heaters | 1 |
Plumbing Installation 1
Kit (Optional)
(3/4" Fittings Include:
2 Unions, 2 Ball Valves,
2 Drain Valves and
1 Pressure Relief Valve.)
OO
314" Gas Connection
i
Gas Supply
314" HotWater Supply Lin,
314" Cold Water S_ly Line
For Building Fixtures
KEY
I _ | 3/4" | Ball | Valve |
| _ | Pressure | Regulator |
3/4" | Union |
|
| I_ | Circulating | Pump | |
|
|
|
|
| |||
| Check | Valve |
| Boiler Drain Valve | |||
|
|
|
|
| |||
z_ | Pressure | Relief | Valve | [_ | Solenoid | Valve | |
|
|
|
|
|
This is not an engineered drawing, It is intended only as a guide and not as a replacement for professionally engineered project drawings. This drawing is not intended to describe a complete system. It is up to the
contractor/engineer to determine the necessary components and configuration of the particular system being installed, This drawing does
not imply compliance with local building code requirements, It is the
responsibility of the contractor/engineer to ensure installation is in accordance with all local building codes. Confer with local building officials before installation.
305 & 505 Outdoor Manual | 15 |