WARNING
TURN OFF ELECTRICAL POWER AT FUSE BOX BEFORE MAKING ANY LINE VOLTAGE CONNECTIONS.
FOLLOW LOCAL ELECTRICAL CODES.
II I
All electrical work must conform to local codes as well as the National Electrical Code,
ELECTRIC POWER SUPPLY
Prior to making any line voltage connections, service switch at boiler should be in the offpnsition and the power turned offat the fuse box.
Run a separate 120 volt circuit from a separate over current protection device in the electrical service entrance panel. This should be a 15 ampere circuit. A ser+ice switch has been provided and should be mounted to the Junction box located on the exterior boiler jacket. See Fig.
The boiler, when installed, must be eleotrically grounded in accordance with the requirements of the authority having
jurisdiction or, in the absence of such requirements, with the National Electrical Code,
Run a 14 gauge or heavier copper wire from the boiler to a grounded connection in the service panel or a properly driven and electrically grounded ground rod.
INSTALL YOUR THERMOSTAT
The thermostat location has an important effect on the operation of your boiler system. BE SURE TO FOLLOW THE
INSTRUCTIONS INCLUDED WITH YOUR THERMOSTAT.
Locate the thermostat about five feet above the floor on an inside wall. It may be mounted directly on the wall or on a
vertical mounted outlet box. It should be sensing average room temperature. Avoid the Following:
DEAD | SPOTS: | COLD | SPOTS: |
| HOT SPOTS: |
| |
Behind | doors | Concealed | pipes | or ducts | Concealed pipes | Lamps | |
Comers | and alcoves | Stairwells | - drafts |
| Fireplace | Direct sunlight | |
|
| Unheated | rooms | on | TV sets | Kitchens | |
|
| other | side | of wall |
| Radios |
|
Set heat anticipator at 0.1 amps. Connect 24 volt thermostat leads to the two(2) yellow wires located in service switch junction box, located on outer jacket of boiler. See
VENT DAMPER WIRING
The boiler is equipped with a factory wired harness with 4 pin molex plug, that plugs into a 4 pin molex receptacle inside the
vent damper operator. The vent damper must be connected for the boiler to operate. Wiring diagrams follow for the various different models.
CAUTION
Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation. Verify proper operation after servicing.
11