m

GAS BUILT-IN

SINGLE & DOUBLE OVENS

MODEL (single).
KGBS 146s
MODEL (double).
KGBS 246s
INSTALLATION INSTRUCTIONS

INSTALLER: FINAL CHECK LIST

PLACEMENT OF UNIT
0 1. Properly positioned - level, aligned and square with cabinet opening.
0 2. Anchored securely to cabinet.
cl 3.0
ven must not be placed under countertop or microwave oven.
ELECTRICAL
0 1. Oven properly grounded,
0 2. Polarized three-wire 12OVAC. 15.20Ampere receptacle with 15-20ampere overcurrent
protection provided for service cord connection.
GAS SUPPLY t
0 1. Supply line of 3/8” black iron pipe provided,
0 2. Manual gas shutoff valve must be installed in accessible location. Do Not install shutoff valve
behind oven.
0 3. Oven connections must be tested for gas leaks.
OPERATIONAL
[7 1. If used on LP gas, verify that pressure regulator and orifice hoods have been modified for
use with LP gas.
0 2. Oven racks installed and
slide freely in all posttions.
0 3. Knobs secured in place and rotate freely without rubbing on edge of control panel glass
holes,
0 4. Selector switch functions in all modes.
0 5. All lights function properly.
0 6. Refer to use and care guide to set electronic clock.
0 7. Doors properly adjusted, open and close smoothly.
0 8. Unless instructed to leave for owner, remove all tags, labels and internal packing material.
0 9. Oven has been wiped clean to remove fingerprints and other smudges.
THANK YOU INSTALLER:
1. Complete Installation Check List.
2. Leave all literature for customer.
3. Notify dealer that installation is completed.
FOR DETAILED INSTRUCTIONS, FOLLOW METHODS DESCRIBED IN THIS FOLDER.