STAND ALONE INSTALLATION TOP VENT
***This installation only applied with the purchase of a duct cover (Model No. CH1
Preparation before Installation
NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE VENT OPENING.
-Decide the location of the venting pipe from the hood to the outside. Refe
-A straight, short venting run will allow the hood to perform more efficient
-Try to avoid as many transitions, elbows, and long run as possible. This m the performance of the hood.
-Use duct tape to seal the joints between pipe sections.
-If necessary, prepare back wall frame with cross framing lumber for secure
-Using references on Table 2 and measurements on page
Hood Preparation before Installation
-Temporarily wire the hood to test for proper operation before installing.
-Peel protective film off the hood and the duct cover (if any).
-Cut the multi vent exhaust according to the size of the venting pipe. Refe
Figure 13
6 Round Vent | 7 Round |
10