Kobe Range Hoods CH2236SQ, CH2230SQ manual Stand Alone Installation Top Vent

Models: CH2230SQ CH2236SQ

1 31
Download 31 pages 21.17 Kb
Page 12
Image 12
STAND ALONE INSTALLATION ￿ TOP VENT

STAND ALONE INSTALLATION ￿ TOP VENT

***This installation only applied with the purchase of a duct cover (Model No. CH1

Preparation before Installation

NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE VENT OPENING.

-Decide the location of the venting pipe from the hood to the outside. Refe

-A straight, short venting run will allow the hood to perform more efficient

-Try to avoid as many transitions, elbows, and long run as possible. This m the performance of the hood.

-Use duct tape to seal the joints between pipe sections.

-If necessary, prepare back wall frame with cross framing lumber for secure

-Using references on Table 2 and measurements on page 21-22, decide the leve lumber. Refer to Figure 14.

Hood Preparation before Installation

-Temporarily wire the hood to test for proper operation before installing.

-Peel protective film off the hood and the duct cover (if any).

-Cut the multi vent exhaust according to the size of the venting pipe. Refe

Figure 13

6￿ Round Vent

7￿ Round

10

Page 12
Image 12
Kobe Range Hoods CH2236SQ, CH2230SQ manual Stand Alone Installation Top Vent