2.Unscrew the six screws on the bottom casing. Remove the bottom casing If nece arrange the electrical wires to run through the 1 diameter hole on the top or the hood. Refer to Figure 5.
3.Using references on Table 1 and measurements on page 21 center the hood in pla beneath the cabinet and flush with the front of the cabinet.
1 Diameter
Figure 4
4.Draw electrical wires through cabinet access opening.
5.Place screw (not provided) into the exact center of each knockout hole. Make screws are in place before tightening screws. CAUTION: MAKE SURE THE HOOD IS SECURE BEFORE RELEASING.
Ductwork Installation
6.Use aluminum or steel pipe to connect the plastic exhaust on the hood to the d above. Use duct tape to make all joints secure and air tight.
7.Continued on page 16.
7