Figure 1

Figure 2

 

-If necessary, prepare back wall frame with cross framing lumber for secure installation. Using references in Table 1 and measurements on page 14, decide the level of the lumber. Refer to Figure 2.

-Important: peel protective film off the duct cover and the hood (if any).

Hood Installation

CAUTION: If required to move the cooking range to install the hood, turn off the power in an electric range at the main electrical box.

SHUT OFF THE GAS BEFORE MOVING A GAS RANGE.

1.Peel protective film off duct cover and hood, if any. Pull out duct cover (inner and outer) from range hood. Shown in Figure 3

Figure 3

2.Align glass canopy to hood body. Shown in Figure 4. Attach the glass canopy to body with four hexagon screws and four spacers (provided). Tighten with hexagon wrench (provided). Shown in Figure 5

Figure 4

Figure 5

3.Attach the LED screen and control panel with two hexagon screws and two spacers (provided). Tighten with hexagon wrench (provided). Shown in Figure 6

Figure 6

5

Page 7
Image 7
Kobe Range Hoods CX1842GS-8 manual Shut OFF the GAS Before Moving a GAS Range