Fit the Suppression Ferrite close to
the Water Delivery connector
Note:
Slide Rail Water Delivery Only
(See Step 42 for the Fixed Head Water Delivery)
Carefully lift the Water
COMPONENTS
Water Delivery
The Suppression Ferrite is packed with the
Digital Mixer
Place the cable in the |
suppression ferrite. Wrap |
Delivery System column
and place the bottom
into the wall jamb
Be very careful not
to scratch or damage
LH
Top Caps
the cable around the cover |
and through the ferrite |
again and then close the |
the tray
Roller Securing Caps
RH
cover until it snaps shut |
STEP |
38 |
Support the weight of the column. Connect
the water pipe to the connector from
at the top of the column.
Plug the electrical cable into the connector from the Water Delivery System at the top of the column.
Caution
STEP |
39 |
Push top of column |
into wall jamb |
until it locks in place |
Fixed Head | Slide Rail |
Water Delivery | Water Delivery |
System | System |
OR
(419)
NOTE:
The Water Delivery System is supplied attached to the Wall Jamb
Glass Panel
Water Delivery Wall
Jamb, Wall Channel
& Glass Clamp
Door Stop Vinyl
(except 800)
5mm
3mm
x9(+4) x4(+1) x3
A
B C
STEP
40
PROCEED TO | STEP | |
STEP 47 | ||
41 | ||
|
2m Pipe and
Connector
Electrical
Cable
x13
Splashguard
3mm
6mm
24 CFI230J | CFI230J 5 |