Kohler CFI230J manual Step

Models: CFI230J

1 14
Download 14 pages 41.65 Kb
Page 8
Image 8
STEP

Ensure glass panel is vertical

±0mm

STEP

9

Drill 4 x 3mm holes

through jamb into wall

channel

Fit 4 x B screws

B

STEP

10

Check glass is vertical. If not

remove screws, re-drill and

re-fit as required.

Re-fit rubber strip over

screws

STEP

11

Fit the fixed roller to the tray on the same side as lintel wall fixing, applying sealant on the edges.

Note: The seal ‘A’ on the glass panel will need to be pulled away, to allow the roller to be fitted, and re-fitted afterwards.

Push the roller onto the slot in the tray until it

locks in place ensuring the plastic glass guide is retained inside the roller body

A

STEP

26

Fit the blanking cap on the other side

of the tray.

Note: The seal ‘A’ on the glass panel will need to be pulled away, to allow the cover to be fitted, and re-fitted afterwards.

STEP

27

Carefully remove the Water Delivery System

from the Water Delivery Wall Jamb.

STEP

12

8 CFI230J

Slacken screws ‘A’. Push the glass panel between

the wall jamb and the glass clamp. The glass

should be 2mm lower than the top of the wall

jamb. Tighten screws ‘A’ when the glass is in

the correct position

A

STEP

13

Push the door stop vinyl into the track and

against the fixed roller (except 800)

STEP

28

Carefully lift door into the enclosure

Important: Requires a minimum of 2 people

Caution

STEP

29

CFI230J 21

Page 8
Image 8
Kohler CFI230J manual Step