Faucet
Thumb
Screw
Rod Link
Clip
7. Complete Drain Installation-Style A
For regular installations, insert the short end of the rod into the body seal hole and under the stopper. For
Remove and adjust the stopper so it lifts about 3/8″ (1 cm) when opened. To adjust, loosen the stopper nut and shorten or lengthen the stopper as needed. Tighten the stopper nut.
Apply three layers of thread tape and a small bead of pipe sealant to the tailpiece threads.
Thread the tailpiece to the body and tighten securely.
Slide one end of the clip onto the rod. Slide the link onto the rod with the thumbscrew facing the back of the ®xture.
Squeeze the other end of the clip, aligning the hole with the rod.
Move the link to the proper position by squeezing the clip and sliding it along the rod.
Insert the lift rod into the hole in the faucet and then into the hole in the link.
Tighten the thumbscrew onto the link so the lift rod knob extends above the lift rod hole.
Kohler Co. | 9 |