Handle | Washer | |
Escutcheon | ||
| ||
Apply Plumbers | Nut | |
Putty. | ||
| Copper | |
| Tube | |
Valve |
| |
Body |
|
2. Handle Valve Installation
NOTE: The valve body marked ″Cold″ (with blue lettered tape attached to the tube) should be installed to the right of the faucet.
Insert the valve bodies into the proper mounting holes.
Apply a bead of plumbers putty or other sealant to the underside of the escutcheons according to the putty manufacturer's instructions.
Install a washer and a nut onto the underside of each valve body.
Rotate each valve body until the copper tubing faces towards the outside of the lavatory.
While holding the valve bodies in place, securely tighten the locknuts with a wrench. Do not overtighten.
Remove any excess putty or sealant.
4 | Kohler Co. |