INSTALLATION REQUIREMENTS
2.3.3.4GPS/IMU Connectivity
•Cabling consisting of six (6) wires will need to run from the V750 to the GPS/IMU.
—It is possible to use existing wires to avoid running new wires by creating an extension with a DB9 connector on each end of the wires. Otherwise the cable from the GPS/IMU will be run from the roof down to the V750 where it will connect to the harness.
•+12VDC power is provided by the V750
2.3.3.5EVDO/3G Router Connectivity
•Requires EVDO/3G PCMIA Card with service activated (provided by customer on their service plan).
•Requires 120VDC
•Requires one CAT5 cable
2.3.4IP Connectivity
In order for VanLink to work remotely from the studio, the
2.3.4.1Master Controller(s) and TNS Accessibility
Master Controller(s) and TNS (if equipped with Controll2_TNS1 software) must have access to the outside internet (see Figure
•Open ports required are: 80, 2000, 2009, 2050, and 2099
—Port 80* (TCP/IP) is the HTTP port required for the
—Port 2000 (TCP/IP & UDP) is for terminal access (TELNET) for remote configuration of the V750 primarily via the Forge application
—Port 2009 (UDP) is the port TouchStar uses to communicate with the program running at the V750
—Port 2050 (TCP/IP) is the port used also used for terminal access for applications other than Forge
—Port 2099 (TCP/IP & UDP) is another port being utilized by Forge for remote configuration