Lennox International Inc Merit Series Gas Furnace Horizontal Left Position, Page

Models: Merit Series Gas Furnace

1 43
Download 43 pages 49.12 Kb
Page 14
Image 14
HORIZONTAL LEFT POSITION

HORIZONTAL LEFT POSITION

Vent Pipe

Top Vent Discharge

 

HORIZONTAL RIGHT POSITION

Top Vent Discharge

Vent Pipe

Pressure Switch

Pressure

 

Switch

 

Flue

AIR

 

Transition

FLOW

 

Cover Plate

 

Make−Up Box

Collector Box

Flue

Transition

AIR

FLOW

Cover Plate

Collector Box

Make−Up Box

DDisconnect pressure switch hose from barbed fitting on the pressure switch assembly. Remove pressure switch assembly (1 screw) and cut wire tie to free pressure switch wires. Re− install pressure switch on the other side of orifice plate and re− connect pressure switch hose.

DRe−secure pressure switch wires: Either pull excess wires through the blower compartment and secure using supplied wire tie, or coil excess wire and secure to the gas manifold.

FIGURE 19

HORIZONTAL LEFT POSITION

Side Vent Discharge

DGas supply piping must be brought into the unit from the bot- tom in order to accommodate the flue pipe.

DCut combustion air inducer tubing from 9" to 8" to avoid interference with inducer motor

DRemove make−up box assembly (2 screws) and cut wire tie to free make−up box wires. Re−install make−up box on other side of cabinet.

DRe−secure make−up box wires: Either pull excess wires through the blower compartment and secure using supplied wire tie, or coil excess wire and secure to the gas manifold.

FIGURE 21

Pressure Switch

Vent Pipe

AIR

FLOW

 

HORIZONTAL RIGHT POSITION

Make−Up Box

Side Vent Discharge

 

 

Pressure Switch

AIR

 

Make−Up Box

Collector Box

 

DCut combustion air inducer tubing from 9" to 7" to avoid interference with inducer motor

DDisconnect pressure switch hose from barbed fitting on the pressure switch assembly. Remove pressure switch assembly (1 screw) and cut wire tie to free pressure switch wires. Re− install pressure switch on the other side of orifice plate and re− connect pressure switch hose.

DRe−secure pressure switch wires: Either pull excess wires through the blower compartment and secure using supplied wire tie, or coil excess wire and secure to the gas manifold.

FIGURE 20

FLOW

Flue Transition

Collector Box

FIGURE 22

Page 14

Page 14
Image 14
Lennox International Inc Merit Series Gas Furnace Horizontal Left Position, Horizontal Right Position, Page