Installation
Soap water method
1. Remove the caps from the | Liquid side | |
2. Remove the |
| |
3. To open the |
| |
counterclockwise approximately 90°, wait for about |
| |
2~3 sec, and close it. | Gas side | |
4. Apply a soap water or a liquid neutral detergent on | ||
the indoor unit connection or outdoor unit | ||
(Open) | ||
connections by a soft brush to check for leakage of | ||
the connecting points of the piping. | (Close) | |
5. If bubbles come out, the pipes have leakage |
|
Evacuation |
|
|
| Hexagonal wrench | Cap | |
1. Connect the charge hose end described in the |
|
|
|
| ||
|
|
|
|
| ||
preceding steps to the vacuum pump to |
|
|
|
|
| |
evacuate the tubing and indoor unit. |
|
|
|
|
| |
Confirm the "Lo" knob of the manifold valve is |
|
|
|
|
| |
open. Then, run the vacuum pump. |
|
|
|
|
| |
The operation time for evacuation varies with |
|
| Indoor unit |
|
| |
tubing length and capacity of the pump. The |
|
|
|
|
| |
following table shows the time required for |
|
|
|
|
| |
evacuation. |
|
|
|
|
|
|
Required time for evacuation when 30 gal/h vacuum |
|
|
|
|
| |
pump is used |
|
|
|
|
| |
If tubing length is less | If tubing length is longer |
|
| Outdoor unit |
|
|
than 10m (33 ft) | than 10m (33 ft) |
|
|
|
| |
|
|
|
|
| ||
10 min. or more | 15 min. or more |
|
|
|
|
|
2. When the desired vacuum is reached, close the |
|
|
|
|
| |
"Lo" knob of the manifold valve and stop the |
|
|
|
|
| |
vacuum pump. |
|
|
|
|
|
|
Finishing the job |
|
|
|
|
|
|
1. With a service valve wrench, turn the valve stem |
|
|
|
|
| |
of liquid side valve | Manifold valve |
|
| |||
open the valve. |
|
|
|
|
|
|
2. Turn the valve stem of gas side valve counter- | Pressure | Lo | Hi |
|
| |
clockwise to fully open the valve. | gauge |
|
|
|
| |
|
|
|
|
| ||
3. Loosen the charge hose connected to the gas |
|
|
|
|
| |
side service port slightly to release the pressure, | Open |
| Close |
|
| |
then remove the hose. |
|
|
|
|
|
|
4. Replace the flare nut and its bonnet on the gas |
|
|
|
|
| |
side service port and fasten the flare nut |
|
|
|
|
| |
securely with an adjustable wrench. This |
|
|
|
|
| |
process is very important to prevent leakage |
|
|
|
|
| |
from the system. |
|
|
|
|
|
|
5. Replace the valve caps at both gas and liquid | Vacuum pump |
|
| |||
side service valves and fasten them tight. |
|
|
|
|
| |
This completes air purging with a vacuum pump. |
|
|
|
|
| |
The air conditioner is now ready to test run. |
|
|
|
|
| |
|
|
|