Installation
Wrap the insulation material around the connecting portion.
1.Overlap the connection pipe heat insulation and the indoor unit pipe heat insulation material. Bind them together with vinyl tape so that there may be no gap.
2.Wrap the area which accommodates the rear piping housing section with vinyl tape.
3.Bundle the piping and drain hose together by wrapping them with cloth tape over the range within which they fit into the rear piping housing section.
Plastic bands | Insulation material |
|
Connection | Indoor | |
unit piping | ||
pipe | ||
| ||
Vinyl tape | Wrap with vinyl tape | |
(wide) |
| |
| Pipe | |
| Vinyl tape(narrow) | |
Connecting cable |
| |
| Pipe | |
Drain hose | Vinyl tape(narrow) | |
| ||
| Wrap with | |
| vinyl tape(wide) |
Reroute the pipings and the drain hose across the back of the chassis.
Piping for |
passage through |
piping hole |
Indoor unit installation
1.Remove the spacer.
2.Ensure that the hooks are properly seated on the installation plate by moving it left and right.
3.Press the lower left and right sides of the unit against the installation plate until the hooks engage into their slots(clicking sound).
Connecting cable
Drain hose
18Room Air Conditioner