INSTALLATION ON GXT 2U UPS
1. Unpack the 2U POD carefully, noting the packing method. Retain the box and packing
material for possible future shipments.
2. Visually inspect the 2U POD for freight damage. Report damage to the carrier and your
local dealer or Liebert representative.
3. Verify that the 2U POD input cord, UPS input cord, and socket for the UPS are the same
type of configuration.
4. If you already have a UPS installed, turn off all connected loads and unplug them from
the UPS. Turn off the UPS and disconnect the input cord.
5. Attach the two POD securing brackets (this is optional for GXT 2U UPS) to the rear of the
UPS (see Figure 4). You will need a long M3 Phillips head screwdriver for this procedure
(the torque is 0.79 Nm, or 7 in-lb). The POD brackets have a hole to allow the screwdriver
to reach the screw.
Figure 4 Attaching POD securing brackets to rear of UPS
NOTE
This manual provides instructions for the 2U POD only. Refer to your UPS
manual for UPS operation and installation instructions.