Installation and Configuration
5.1.2Rack-Mount UPS Installation
When using the GXT2 in a
When using the optional Adjustable Rack Mount Kit, you will use the following instructions. The fig- ures accompanying 5.1.3 - Installing the Adjustable
! CAUTION
Only three (3) M4 screws are used on the side of the GXT2 where the Power Distribution Box is located. The fourth mounting hole is above the Power Distribution Box and is not used.
5.1.3Installing the Adjustable Rack-Mount Kit—Sold Separately
This kit contains parts needed to mount several different models of UPS and external battery cabi- nets into
Parts included are:
Item | Quantity |
|
|
Rear bracket members | 2 |
|
|
Front bracket members | 2 |
|
|
Inner bracket members | 2 |
|
|
M4 x 8mm machine screws | 16 |
|
|
M4 locking hex nuts | 8 |
|
|
M5 x 16 mm machine screws | 12 |
|
|
Grease packet. | 1 |
|
|
Tools needed for installation are:
•one Phillips screwdriver
•one 7mm wrench
The adjustable
To install the rack mount brackets:
1.Unpack two (2)
Remove inner member of each bracket assembly as shown at right by extending it to its outermost position, depress- ing the retaining latch and then pulling the inner member out of the bracket assembly.
2.Determine the height position inside the rack enclosure where you want to mount the UPS or battery cabinet.
Return flanges
Retaining
Latches
Front
Innermembers members
! CAUTION
Reduce the risk of tipping the rack enclosure by placing the UPS or battery cabinet in the lowest possible rack position.
12