Installation

3.0 INSTALLATION

3.1 Preparation

! CAUTION

The UPS and battery cabinets are heavy (see Table 6 and Table 7). Take proper precautions when lifting or moving either the UPS or battery cabinets.

The Liebert PSI XR may be installed in either a tower or rack configuration. Determine the method that suits the application and proceed.

Decide where to install the Liebert PSI XR. The UPS must be installed indoors in a controlled envi- ronment. Place it in an area with unrestricted airflow around the unit, away from water, flammable liquids, gases, corrosives and conductive contaminants (see Figure 6).

Maintain a minimum clearance of 12 inches (305mm) in the front and rear of the UPS. Maintain an ambient temperature range of 32°F to 104°F (0°C to 40°C).

Figure 6 Placing the Liebert PSI XR

AI

R

R

I

 

A

 

 

 

 

 

A

 

 

 

 

 

I

 

 

 

 

 

R

 

 

 

 

 

 

m

 

 

 

 

 

m

 

 

 

 

5

 

 

 

 

0

 

 

 

 

3

 

 

 

 

./

 

 

 

 

2 in

 

 

 

 

 

1

 

 

 

 

 

 

32 F (0 C)

104 F (40 C)

Relative humidity

0% ~ 90%

(non-condensing)

7

Page 11
Image 11
Liebert PSI XR user manual Preparation, Installation, Relative humidity, Non-condensing, 104 F 40 C