Manuals
/
Liebert
/
Computer Equipment
/
Network Card
Liebert
manual
Liebert XDH
Models:
XDH
1
1
36
36
Download
36 pages
42.35 Kb
1
2
3
4
5
6
7
8
Specs
Install
Hard pipe connection diagram
Connecting High Voltage Wiring
Internal Access
Safety
Page 1
Image 1
Pr
e
ci
s
io
n
C
o
o
li
n
g
Fo
r
B
u
si
n
es
s
-C
r
iti
c
al
C
o
n
tinuit
y
™
Li
e
be
r
t
®
X
DH
™
Us
e
r
M
a
n
u
a
l - 50 &
6
0
H
z
Page 1
Page 2
Page 1
Image 1
Page 1
Page 2
Contents
Liebert XDH
Fluorinated Greenhouse Gas Requirements-European Union
General Safety Guidelines
Table of Contents
Specifications
Maintenance
Operation
Liebert XDH component locations
Example XDH32BK
Product Description
Pre-Installation Checks
References
Parts Included With the Liebert XDH
Room Preparation
Installation Considerations
Checking and Unpacking
Product/System Description
Recyclable Packaging
Equipment Inspection
Unpacking the Unit
Unit Handling
Prepare ramp to remove the Liebert XDH from shipping pallet
Taking the Unit off the Pallet
Attaching ramp, removing the Liebert XDH from pallet
Installing the Liebert XDH Within the Enclosure Row
Determining Placement in the Conditioned Space
XDH
Airflow Direction
Change airflow direction
Install Air Diffusers for Best Airflow Direction
European Union Fluorinated Greenhouse Gas Requirements
System Connection Configuration
Typical Liebert XDH piping-non-interlaced connection
Indirect system configuration-hydraulic system schematic
Connection Methods and Points
Hard pipe connection diagram
Piping Considerations-Hard-Piped Connections
Venting the Holding Charge and Connecting to Mains
Rear of Liebert XDH
Connection Methods for Hard Pipe
Connecting Methods-One-Shot Connections
Recommended Piping Size
Brazing Preparations
Degree Connection
Header System
Connecting Liebert XD Flex Pipes to Liebert XDH Modules
Tools Required
Liebert XD prefabricated piping assembly
Tools Required
Insulation
Return Line Service Valve Supply
Electrical
Connecting High Voltage Wiring
Condensate wiring entry points
Connecting Low Voltage Wiring-Optional
Charging with Refrigerant and Starting the Liebert XD System
Checklist for Proper Installation
Operation
Start the Liebert XDH
Fluorinated Greenhouse Gas Requirements
Internal Access
Remove fan tray
Remove Fan Tray
Specifications
Liebert XD Flex Pipe assemblies, supply and return
Page
Ne t
Top
Page
Image
Contents