Lifebreath installation manual For Models, Contains, 95MAX 155MAX 200MAX, 200ERV 200ERVD

Models: 155MAX 95MAX 200MAX

1 32
Download 32 pages 15.63 Kb
Page 1
Image 1
CLEAN • FRESH • AIR

®

CLEAN • FRESH • AIR

OPERATION AND

INSTALLATION MANUAL

Contains

ControlAir 15

For Models:

95MAX

155MAX

200MAX

MAXTOP 195DCS 300DCS

200ERV

200ERVD

IMPORTANT - PLEASE READ THIS MANUAL BEFORE INSTALLING UNIT

CAUTION

Before installation, careful consideration must be given to how this system will operate if connected to any other piece of mechanical equipment, i.e. a forced air furnace or air handler, operating at a higher static. After installation, the compatibility of the two pieces of equipment must be confirmed by measuring the airflow’s of the Heat Recovery Ventilator (HRV) or Energy Recovery Ventilator (ERV) by using the balancing procedure found in this manual.

It is always important to assess how the operation of any HRV/ERV may interact with vented combustion equipment (ie. Gas Furnaces, Oil Furnaces, Wood Stoves, etc.).

NEVER install a ventilator in a situation where its normal operation, lack of operation or partial failure may result in the backdrafting or improper functioning of vented combustion equipment!!!

TO BE COMPLETED BY CONTRACTOR AFTER INSTALLATION

Installing Contractor

Telephone / Contact

Serial Number

Installation Date

Model

* LEAVE FOR HOMEOWNER

NOTE: Due to ongoing research and product development, specifications, ratings and dimensions are subject to change without notice.

TI-84R-NE

0112

Page 1
Image 1
Lifebreath installation manual For Models, Contains, 95MAX 155MAX 200MAX, 200ERV 200ERVD, MAXTOP 195DCS 300DCS