Master Station Rough-In
VMC1MB Installation - Finished Wall
Cut out an opening in the drywall (Height
TRACE THIS AREA AS A TEMPLATE FOR MASTER STATION OPENING ON DRYWALL
CUT OPENING 5/8” FROM STUD
STUD BEHIND
DRYWALL
11”
VMC1MB | CUT DRYWALL |
OPENING |
DRYWALL OPENING
IS 5/8” FROM STUD
DRYWALL
FRONT VIEW
SLIDE VMC1MB BRACKET
VERTICALLY INTO DRYWALL
OPENING
FRONT VIEW | DRYWALL |
|
STUD
DRYWALL OVERLAPS BRACKET
FRONT VIEW
DRYWALL
THEN TURN BRACKET 90°
CLOCKWISE AND MOUNT
TO STUD
DRYWALL
HANG POWER
SUPPLY ON VMC1MB
BRACKET AS SHOWN.
USE HAMMER TO LIGHTLY
TAP INTO PLACE ON MASTER
STATION BRACKET FLANGE
Figure 2. Installing Bracket - Finished Wall
9