Linear VMC-1 manual VMC1MB Installation Finished Wall

Models: VMC-1

1 24
Download 24 pages 57 Kb
Page 11
Image 11

Master Station Rough-In

VMC1MB Installation - Finished Wall

Cut out an opening in the drywall (Height 7-1/4” x Width 11”) but do not cut right up against the wall stud. Allow 5/8” clearance between drywall opening and stud.This ensures that drywall will overlap bracket (See Figure 2). Slide the VMC1MB vertically, then turn clockwise 90˚. Mount in place onto stud using fasteners as shown. Hang Power Supply on VMC1MB in the lower right corner as shown. It may be necessary to lightly tap Power Supply in place onto VMC1MB flange with a hammer.

TRACE THIS AREA AS A TEMPLATE FOR MASTER STATION OPENING ON DRYWALL (7-1/4” x 11”)

CUT OPENING 5/8” FROM STUD

STUD BEHIND

DRYWALL

11”

VMC1MB

CUT DRYWALL

OPENING

7-1/4”

DRYWALL OPENING

IS 5/8” FROM STUD

DRYWALL

FRONT VIEW

SLIDE VMC1MB BRACKET

VERTICALLY INTO DRYWALL

OPENING

FRONT VIEW

DRYWALL

 

STUD

DRYWALL OVERLAPS BRACKET

FRONT VIEW

DRYWALL

THEN TURN BRACKET 90°

CLOCKWISE AND MOUNT

TO STUD

DRYWALL

HANG POWER

SUPPLY ON VMC1MB

BRACKET AS SHOWN.

USE HAMMER TO LIGHTLY

TAP INTO PLACE ON MASTER

STATION BRACKET FLANGE

Figure 2. Installing Bracket - Finished Wall

9

Page 11
Image 11
Linear VMC-1 manual VMC1MB Installation Finished Wall