SUPPORTING OF PLATEN
BALE CHAMBER
DOOR, OPEN
FEED GATE OPEN -
PLATEN IN UP
POSITION
100mm x100mm
WOOD BEAM IN
EACH REAR
CORNER
FRONT VIEW OF BALER
WARNING: BEFORE ENTERING BALE CHAMBER FOR SERVICE, BE SURE THAT
THE PLATEN IS SECURELYSUPPORTED. ATA MINIMUM, USE TWO WOODEN
100mm x 100mm BEAMS (GOOD CONDITION), CUT TO FITSNUG IN EACH REAR
CORNER OF THE CHAMBER WHILE SUPPORTING THE PLATEN IN THE UP
POSITION. THE TOPEND OF EACH BEAM SHOULD BE IN THE EXTREME
CORNER, WHILE THE BOTTOM END SHOULD BE POSITIONED OVER THE
OUTER TIE SLOT IN THE FLOOR. SEE DIAGRAM BELOW.
BEAM OVER
OUTER TIE
SLOT IN FLOOR
2-2
DANGER: DO NOT CLIMB ON SIDES OF BALER. USE A LADDER OR WORK
P L ATFORM WHEN WORKING ON TO P OF THE BALER OR OTHER AREAS OF
THE BALER THAT CANNOT BE REACHED FROM GROUND LEVEL.
WARNING:FEED GATE WILL EXTEND ABOVE THE TOP OF THE BALER
WHEN THE FEED GATE IS RAISED.
CAUTION: TURN DISCONNECT TO THE OFF POSITION, LOCK-OUT AND TAG-
OUT POWER BEFORE SUPPORTING THE PLATEN.
2 MAINTENANCE