Manuals
/
Marathon Computer
/
Computer Equipment
/
Laptop
Marathon Computer
V-4224
installation manual
0489, Hydraulic Schematic
Models:
V-4224
1
26
31
31
Download
31 pages
21.88 Kb
23
24
25
26
27
28
29
30
Operating Characteristics
Install
Parts list
Charts Electrical Requirements
Maintenance
Feed Gate Latch Adjustment
Pressure Setting
TIE Slot Cleaning
Magnetic Interlock Testing
Decal Placement
Page 26
Image 26
2 MAINTENANCE
HYDRAULIC SCHEMATIC
E-0489
5 HP / 3.7 KW
6 GPM / 22.7LPM
2-13
Page 25
Page 27
Page 26
Image 26
Page 25
Page 27
Contents
Play IT Safe
VERNON, AL FAYETTE, AL YERINGTON, NV CLEARFIELD, PA
Contents
Operation
EC Declaration of Conformity
Stand Clear While Baler is in Operation
PRE-OPERATING Instructions
Controls
ON-OFF Keyed Selector Switch
Control Description
Operating Instructions Making a Bale
To Make a Bale
Operating Instructions Bale TIE OFF/BALE Eject
For Bale TIE OFF & Bale Eject
Side View
Diagram Bale TIE OFF/BALE Eject
Front View of Baler
Bale
TIE Slot Cleaning
Slot Cleaning Tool Front View
Decals
Decal Placement
460400
Supporting of Platen
Monthly
Periodic Maintenance
Annual Filter Maintenance
Three Months
Pressure Setting
Hydraulic System Pressure Setting
Pressure Setting and Interlock Testing
Magnetic Interlock Testing
Cylinder Rebuilding
Cylinder Removal and Rebuilding
Cylinder Removal
Feed Gate Latch Adjustment
Operating Characteristics
Principles of Operation
Charts Electrical Requirements
Voltage
Panel BOX
Power Unit
Electrical Schematic
Hydraulic Schematic
0489
Parts List
Recommended Oils
Installation
General Installation
Anchoring to Concrete PAD
Electrical Installation
Grounding Instructions
Motor Rotation Applies to Three Phase Units only
START-UP Instructions
Top
Page
Image
Contents