Matsushita CF-30 service manual Q Preparation of DIMM Cover, 9-27, Safety Working

Models: CF-30

1 81
Download 81 pages 22.15 Kb
Page 49
Image 49
QPreparation of DIMM Cover

QPreparation of DIMM Cover

* Notes:

1.Apply the load when attaching the parts. 20N to 30N (2 to 3Kgf)/cm2

DIMM Cover is set

0 0.5mm

Attach the DIMM Cover Cushion

0 0.5mm

Attach the DIMM Cover Spacer

0 0.5mm

Attach the Keyboard Cable Cover Cushion9-27 0 0.5mm

 

 

 

 

Safety Working

 

* Notes:

Keyboard Cable Cover is installed

 

 

Attach the CD Edge Sheet

1. Apply the load when attaching the attaching parts. 20N to 30N (2 to 3Kgf)/cm2

 

 

 

0 1mm

LCD Cable Cover is set

 

 

 

 

4 6mm

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4 6mm

 

 

 

 

 

 

 

 

 

 

 

1.5

2.5mm

 

 

 

 

 

 

 

 

Attach the CD Edge Sheet

 

 

 

 

 

 

 

Attach the LCD Cable Cover Cushion

 

Safety Working

 

Attach the Keyboard Cable Cover Cushion

 

 

 

 

 

 

 

 

 

9-27

Page 49
Image 49
Matsushita CF-30 service manual Q Preparation of DIMM Cover, 9-27, Safety Working, Attach the Keyboard Cable Cover Cushion