Matsushita CF-30 service manual Setting the PAD PCB, Safety Working

Models: CF-30

1 81
Download 81 pages 22.15 Kb
Page 43
Image 43
9.2.11. Setting the PAD PCB

9.2.11. Setting the PAD PCB

1.Fix the PAD PCB using the 2 Screws. <N4>

2.Attach the TP PCB Screw Sheet.

3.Connect the Cable to the Connector. (CN802)

4.Connect the Cable to the Connector (CN801) and attach the Tape.

TP PCB Screw Sheet

Tape <N4>

Screws <N4>: DRQT26+D3FKL

<N4>

Connector (CN801)

Pad PCB

Connector (CN802)

QAssembly of PAD PCB

 

Order of fixing

* Notes:

Screw

Screw

1. Apply the load when attaching the parts. 20N to 30N (2 to 3Kgf)/cm2

Insert the boss at an angle to put here close to the Cabinet side.

Process the SP cable between the bosses.

FFC Insertion

PCB Pad is set

Safety Working

Cable Hold Sheet

Attach the Touch Pad

PCB Screw Sheet

is installed

 

Safety Working

Attach the Touch Pad INS Sheet

Avoid running over the boss and the rib.

0

2

Safety Working

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Do not insert the Connector at an angle.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0

2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FFC Insertion

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Attach the Touch

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Tighten of

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Pad FFC Fix Tape

 

 

 

 

 

 

Attach the Tape

 

 

 

 

 

 

Screw

 

 

 

 

 

 

 

 

 

 

 

 

0 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fit to the Cabinet line.

 

 

 

 

 

 

 

 

 

Tighten of

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7

11

 

 

 

 

Screw

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Safety Working

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Safety Working

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0

2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Attach the

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cable Sheet

 

 

 

 

 

 

 

 

 

 

 

 

 

Attach the Tape

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fit to the Cabinet line.

 

 

 

 

 

7 11

 

 

 

 

 

 

 

 

 

 

 

Safety Working

 

Process the surplus of FFC to the back.

PCB Pad

LED PCB

Process the wire targeting the boss.Manual backgroundManual background

CN Connection After connecting, add the kapton tape.

9-21

Page 43
Image 43
Matsushita CF-30 service manual Setting the PAD PCB, Safety Working