Matsushita CF-30 service manual Q Assembly of USB PCB and Antenna PCB, 9-25, Safety Working

Models: CF-30

1 81
Download 81 pages 22.15 Kb
Page 47
Image 47
QAssembly of USB PCB and Antenna PCB

QAssembly of USB PCB and Antenna PCB

* Notes:

1. Apply the load when attaching the parts. 20N to 30N (2 to 3Kgf)/cm2

Safety Working

Attach the Tape

Safety Working

Attach the Antenna Cable Sheet

Order of fixing

Screw9-25 Screw

Set on the top.

W-LAN Cable

Connection

EXT Antenna PCB is set

Process the cable from LCD.

Fit to the groove.

 

 

Difference : 1 or less

 

Antenna Cable

Tighten of Screw

Plate is set

 

 

 

 

 

 

 

 

 

Connect the coaxial cable from LCD.

Tighten of

Screw Manual background

Along the groove Manual backgroundManual background

Tighten of

Screw Manual background

Pull W-LAN Cable out to the surface from the hole.

* Notes:

1. Apply the load when attaching the parts. 20N to 30N (2 to 3Kgf)/cm2

Match to the board edge.

Difference: less than 1

Match to the CN edge.

Difference: less than 1

Attach the kapton tape into CD Edge Sheet.

Safety Working

Tighten of Screw

PCB USB Sub is set

 

Cable USB is set

9-25

Page 47
Image 47
Matsushita CF-30 service manual Q Assembly of USB PCB and Antenna PCB, 9-25, Safety Working