McCulloch M12T92RB, MBA16107BRK To Assemble Bagger, Bagger adjustment, Horizontal adjustment

Models: RE13592RB P135B92RB P1292RB PF12T92RB RB125T92 M135B92RB M125B92RB M12T92RB MB20107HBRK MBA165107BRK MBA16107BRK

1 92
Download 92 pages 48.26 Kb
Page 25
Image 25
To Assemble Bagger

1

2

2

To Assemble Bagger

1.

Front bagger tube

 

4

3

 

2.

Lower bagger tube

 

 

 

3.

1/4 x 50,8mm Carriage

 

 

 

Bolts

 

 

4.

1/4 Lock nut

 

 

 

5

 

 

 

3

 

 

 

2

 

 

 

 

7

6

 

 

 

8

92 025

02593

NOTE: For ease of assembly, you may wish to obtain the assistance of another person when putting the bagger to- gether.

Holes in front bagger tube are at an angle. Place front bagger tube against lower bagger tube and check for proper hole alignment before assembling bolts.

Assemble front and lower bagger tubes using four (4) 1/4 x 50,8mm carriage bolts and lock nuts supplied. Tighten securely.

Slide front and lower bagger tube assembly into the bag- ger assemby.

Assemble front and upper bagger tubes using four (4) 1/4 x 50,8mm carraige bolts and lock nuts supplied. Tighten securely.

Slip all the vinyl bindings over the bagger tubes

Slide the bagger dump handle through the hole in the bagger top, install the clevis pin and secure with retainer spring.

Push cap over end of bagger dump handle.

NOTE: For future use, the clevis pin may be removed in order

1. Front bagger tube

1

2.1/4 x 50,8mm Carriage Bolts

3.1/4 Lock nut

4.Vinyl Binding

5.Dump handle tube

6.Clevis pin

7.Retainer spring

8.Cap

2

4

6MM (1/4") - 9MM (3/8")

1

to use the handle to clear the chute in the event it has become clogged.

Bagger adjustment

For proper bag function and appearance, it may be neces- sary to adjust the bagger assembly. There should be 6mm (1/4")-9mm (3/8") gap between the bagger top and fender and the bagger top surface should be even with the top surface of the fender. To adjust bagger position:

Horizontal adjustment

Slightly loosen the nuts securing the bagger RH and LH

 

horizontal adjustment brackets. Loosen only enough so

 

the brackets keep their position, but allow them to be

 

moved.

Move the brackets the amount forward or backward you

3

02329

1.Top Surfaces Even

2.Horizontal Adjustment Bracket

3.Vertical Adjustment Bracket

wish the bag assembly to move. Retighten the nuts se-

curely.

Vertical adjustment

Slightly loosen the nuts securing the vertical adjustment brackets. Loosen only enough so the brackets keep their position, but allow them to be moved.

Move the brackets the amount up or down you wish the bag assembly to move. Retighten the nuts securely.

Reinstall the bagger assembly and check the bagger to fender fit. If necessary, repeat the procedure until proper fit is attained.

To convert to bagging, mulching or discharge See "Section 5" of this manual.

25

Page 25
Image 25
McCulloch M12T92RB, MBA16107BRK, RB125T92 To Assemble Bagger, Bagger adjustment, Horizontal adjustment, Vertical adjustment