8

!CAUTION

To reduce the risk of bodily injury from lifting, the following assembly step, #5, will require two people.

Step 5

Hood/Body To Cart Assembly

Lift the Hood/Body Assembly over the cart assembly and set it down until it rests on the top of the cart legs.

Align the holes in the side of the Body with the holes in the legs. Insert two 1/4-20 x .50 Bolts through the holes in the firebox flanges (Back Left Side View) and into threaded inserts in the inside face of the back legs. Insert two 1/4-20 x

1.50Bolts through the holes in the front legs and two 1/4-20 x .50 Bolts through the holes in the rear leg flanges (Right Side View) and into threaded inserts in firebox. Tighten after all are installed.

Back

Left Side View

1/4-20 x .50” Bolt set

4 pcs

1/4-20 x .50” Bolt

1/4-20 x 1.50” Bolt set

2 pcs

Right Side View

1/4-20 x 1.50” Bolt

Page 8
Image 8
Meco 67A4T09K21 manual Step Hood/Body To Cart Assembly