2. Installation

2.4 Installation of the communications-card option

Tower model

1 Slot for the communications-card

It is not necessary to shut down the UPS to

option.

install the communications card:

U-Talk USB

 

 

 

1

- Remove the slot 1 cover secured by

 

two screws.

 

2

- Insert the card in the slot.

 

3

- Secure the card with the two screws.

1

2

Rack model

1Slot for the communications- card option.

USB

1

2

RS232

51031604EN/AA - Page 15

Page 15
Image 15
MGE UPS Systems Pulsar EX 700, Pulsar EX 1000, Pulsar EX 1500 Installation of the communications-card option, Tower model