
3-4. Installing Welding Power Source Onto Rack
1
2
For XMT 304/EX 300 And | For XMT 304/EX 300 |
XMT 456/Invision 456 Models | Models Only |
Location of mounting holes
in bottom of base (both sides).
For XMT 456/Invision 456 Models Only
Have only qualified persons make this installation.
YTurn Off welding power sources before inspecting or installing rack.
For XMT 304/EX 300 Models
1 Welding Power Source
Position welding power source onto rack shelf so threaded holes in feet are over correct holes in shelf on rack (see illustration). Welding power source front panel should face side of rack with isolated ter- minal on base as shown.
2 Securing Bolts And Hardware
Install supplied bolts through rack shelf into welding power source feet and tighten.
For XMT 456 and Invision 456 Models
1 Welding Power Source
Position welding power source onto rack shelf so holes in base of welder align with correct holes in shelf on rack (see illustration). Welding power source front panel should face side of rack with iso- lated terminal on base as shown.
.The
Install
Holes 1 And 4 | Holes 5 And 6 | Holes 7 And 10 | |||||||||
|
|
|
|
|
|
|
|
|
|
|
|
Mounting Hole
Pattern For
XMT 304/EX 300
Models
(Both Shelves)
Holes 2 And 5 | Holes 6 And 9 | Mounting |
|
| Shelves |
Mounting Hole
Pattern For XMT
456/Invision 456
Models
(Both Shelves)