Miller Electric S-62, S-64 manual Operation, Front Panel Controls

Models: S-64 S-62

1 36
Download 36 pages 22.71 Kb
Page 21
Image 21

SECTION 5 – OPERATION

5-1. Front Panel Controls

1Voltmeter (Optional) (See Section

NO TAG)

2Wire Speed Meter (Optional)

Factory set to display inches per minute. If display of meters per minute is desired, see Section 4-9.

3 Schedule A Wire Speed Control

The scale is calibrated in inches per minute x 100 and meter per minute.

4Schedule A Voltage Control (Optional)

.For dual schedule applications, a dual schedule switch is required for the gun.

Obtain a proper dual schedule switch and install according to its instructions.

5Schedule B Indicator Light (Optional)

6Schedule B Voltage Control (Optional)

7Schedule B Wire Speed Control (Op- tional)

8Press To Set Button (Optional)

Press and hold button to preset Schedule B wire feed speed and/or voltage.

9 Jog/Purge Switch

Push up to momentarily feed welding wire at speed set on Wire Speed control without en-

ergizing welding circuit or shielding gas valve.

Push down to momentarily energize gas valve to purge air from gun or adjust gas reg- ulator.

Center position is off.

10 Trigger Hold Switch (Optional)

Push up to weld without holding gun trigger throughout the weld cycle.

To start weld, press and release gun trigger within three seconds after an arc has been struck. To end weld, press and release gun trigger.

1

2

10

3

4

5

6

7

98

ST-151 845-B

OM-1579 Page 17

Page 21
Image 21
Miller Electric S-62, S-64 manual Operation, Front Panel Controls