USN Installation
Mounting the Board Assemblies
1.Determine an appropriate location for the
2.Mount the board, facing outward, such that access to critical controller components is not blocked.
3.For PTC/PHC programmable controllers, mount the M2C assembly near the
Motion 3000ES Installation
For Motion 3000ES, only the
Mounting the Board Assemblies
1.Determine an appropriate location for the
2.Mount the board, facing outward, such that access to critical controller components is not blocked.
USN Power Connection, Elevators
Before the USN can be configured, it must be powered up. But, no communication connections, serial, Ethernet, or CAN, should yet be attached.
1.Connect the provided leads to the power transformer.
2.Connect the power transformer leads to AC1/AC2 on the top right side of the
3.Plug the power transformer into the AC receptacle in the controller. (Note: If alternate outlet is used, power must be in phase with controller 110 VAC.)
Power Connection, Escalators
The power transformer is not required for Motion 3000ES escalator installations.
1.Using 18 AWG, white, teflon coated wires, connect
3