This chapter provides information about powering up the PrPMC800/800ET system, and functionality of the status indicators, and I/O ports on the PrPMC800/800ET module.
Applying Power
After you have verified that all necessary hardware preparation has been done, that all connections have been made correctly, and that the installation is complete, you can power up the system. The MPU, hardware and firmware initialization process is performed by the PPCBug firmware at
The firmware, PPCBug, is shipped from the factory with an appropriate set of defaults. In most cases there is no need to modify the firmware configuration before you boot the operating system. However, if you choose to do so, refer to Chapter 6, Modifying the Environment for further information about modifying these defaults.
The following flowchart shows the basic initialization process that takes place during PrPMC800/800ET system
For further information on PPCBug, refer to Chapter 5, PPCBug, or to the PPCBug documentation listed in Appendix C, Related Documentation.