Overhead Chute Control Assembly

Handle Assembly

1.Place the shift lever in the Forward-6 position.

2.Observe the lower rear area of the snow thrower to be sure both cables are aligned with roller guides before pivoting the handle upward. See Figure 3-11.

Figure 3-11

NOTE: Make certain the cables are seated properly in the roller guides. See Figure 3-2.

3.Secure the handle by tightening the plastic knob located on both the left and right sides of the handle. Remove and discard any rubber bands, if present. They are for packaging purposes only.

Chute Assembly

1.Remove wing nut and hex screw from chute control assembly and clevis pin and cotter pin from chute support bracket. Position the chute assembly (forward-facing) over the chute base. See Figure 3-12.

Figure 3-12

2.Place chute assembly onto chute base and secure chute control assembly to chute support bracket with clevis pin and cotter pin removed earlier. See Figure 3-13.

Figure 3-13

Section 3 — Assembly & Set-Up

 

11