Manuals
/
Multiquip
/
Household Appliance
/
Septic System
Multiquip
ST4125G, ST6125G operation manual
Models:
ST6125G
ST4125G
1
27
28
28
Download
28 pages
30.45 Kb
21
22
23
24
25
26
27
28
<
>
Troubleshooting
Specification
Install
Three Phase Control Box/Pump System Diagram
Pump Placement
Warranty
Dimension
Maintenance
Motor Winding Configuration
Connecting SW-1WOPA Float Switches to Control Box
Page 27
Image 27
NOTES
ST4125G/ST6125G SUBMERSIBLE PUMP• OPERATION MANUAL — REV. #0 (11/18/10) — PAGE 27
Page 26
Page 28
Page 27
Image 27
Page 26
Page 28
Contents
SUBMERSIBLE PUMP
OPERATION MANUAL
THIS MANUAL MUST ACCOMPANY THE EQUIPMENT AT ALL TIMES
MODEL ST4125G/ST6125G
ST4125G/ST6125G
TABLE OF CONTENTS
Float Switches
Control Box Installation
Page
Symbol
SAFETY INFORMATION
SAFETY MESSAGES
SAFETY SYMBOLS
SAFETY INFORMATION
GENERAL SAFETY
fire extinguisher
first aid kit
SAFETY INFORMATION
PUMP SAFETY
ELECTRICAL SAFETY
NEVER disconnect any emergency or
LIFTING SAFETY
Power Cord/Cable Safety
Grounding Safety
Control Box Safety
ST4125G/ST6125G SUBMERSIBLE PUMP - SPECIFICATIONS
Table 1. Specifications
Model
ST6125G
ST4125G/ST6125G SUBMERSIBLE PUMP - DIMENSIONS
Figure 1. ST4125G/ST6125G Pump Dimensions
ST4125G
ST4125G/ST6125G - GENERAL INFORMATION
Figure 2. Submersible Pump Components
ST4125G/ST6125G - COMPONENTS
How It Works
FLOAT SWITCHES
Mechanical Float Switch
Design Features
Figure 6. Float Switch Application
Float Switches
Mounting The Float Switches
FLOAT SWITCHES
Used With
CB12/CB14 Control Boxes
Table 3. Control Box Specifications
Control Box
Power Cord Requirements
CONTROL BOX INSTALLATION
Control Box Installation
3-Phase Power Installation Input
Terminal
Connecting SW-1WOPA Float Switches to Control Box
Table 5. Dual Float switch Connections
Wire
230 VAC
230/460 VAC VOLTAGE SELECTION
230/460 VAC Voltage Selection
MOTOR WINDING CONFIGURATION
Wire Color
CB12/CB14 CONTROL BOX POWER CONNECTIONS
3-Phase Power Installation Output To Pump
Table 6. 3Ø-230/460 VAC Input Power Connections
SWITCH
CB12/CB14 CONTROL BOX WIRING LAYOUT
Figure 9. Three Phase Control Box/Pump System Diagram
CONTROLLER AC POWER TERMINAL BLOCK FLOAT SWITCH TERMINAL BLOCK
Figure 11. Tilted Position Incorrect
Pump Placement
Control Box Operation Manual Mode
OPERATION
OPERATION
Control Box Operation Auto Mode
Reset Button
Shut-Down
Changing Lubrication Oil
MAINTENANCE
Lubrication
Checking Lubrication Oil Level
MAINTENANCE
Impeller Removal
Long Term Storage
Water Tank Storage
Insulating Material Testing
Electrical Insulation Testing
Why perform electrical insulation testing?
What is Insulation Resistance Testing
SOLUTION
TROUBLESHOOTING
Table 8. Pump Troubleshooting
SYMPTOM
CB-12
CB12/CB14 CONTROL BOX WIRING DIAGRAM
THREE PHASE WIRING
Figure 21. CB12/CB14 Control Box Wiring Diagram
Page
Service Department
OPERATION AND PARTS MANUAL
HERE’S HOW TO GET HELP
PLEASE HAVE THE MODEL AND SERIAL NUMBER ON-HAND WHEN CALLING