Multiquip ST6125G Connecting SW-1WOPA Float Switches to Control Box, Terminal, Wire, Color

Models: ST6125G ST4125G

1 28
Download 28 pages 30.45 Kb
Page 16
Image 16
Connecting SW-1WOPA Float Switches to Control

CONTROL BOX INSTALLATION

Connecting SW-1WOPA Float Switches to Control

Box

1.Remove the float switch input connector housing, then route the fl oat switch wires through the cable gland on the control box. Attach the wires of the fl oat switch to the terminal block as indicated by Table 5 and Figure 9.

Table 5. Dual Float switch Connections

Float

Terminal

Wire

Switch

Block No.
Color

Start

TB1-A1

Black

TB1-A2

White

 

Stop

TB1-A3

Black

TB1-A4

White

 

2.Tighten the connector housing to ensure a tight fi t between the cord and the connector body. This will prevent the cable from pulling out of the terminal block and also prevent moisture from entering the control box.

3.Determine the tether length of the fl oat switch wires then secure float switch wires to pump discharge hose. See Figure 3 and Table 2 to determine the pumping range.

PAGE 16 — ST4125G/ST6125G SUBMERSIBLE PUMP • OPERATION MANUAL — REV. #0 (11/18/10)

Page 16
Image 16
Multiquip ST6125G Connecting SW-1WOPA Float Switches to Control Box, Dual Float switch Connections, Terminal, Wire, Color