Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller manual Venting

Models: MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller

1 48
Download 48 pages 54.54 Kb
Page 16
Image 16
EXIT TERMINALS OF MECHANICAL DRAFT

VENTING

may require venting modifications (consult factory). The air inlet must be a minimum of 1' vertically above the maximum snow level. It is very important that there are no other vents, chimneys or air inlets in any direction for at least 4'.

C

12

in.

 

 

minimum

Direct vent terminal clearance Minimum clearance, C

4 ft.minimum

 

 

4

 

 

minimum

 

 

ft.

12

in.

 

 

 

 

minimum

Mechanical draft vent terminal (see 10.8.1)*

Mechanical draft vent terminal

(see 10.8.2)*

Less than 10 ft.

12 in.minimum

3 ft.minimum

Input (Btu/hr)

Clearance (in.)

10,000 or less

6

10,001 to 50,000

9

Over 50,000

12

(see 10.8.3)*

 

For SI units: 1 ft = 0.305 m; 1 in. = 25.4 mm; 1 Btu/hr = 0.293 W

Grade

Forced air inlet

EXIT TERMINALS OF MECHANICAL DRAFT

AND DIRECT-VENT VENTING SYSTEM

*REFERENCE: THE NATIONAL FUEL GAS CODE 2002 EDITION

CAUTION

Flue Gas will condense as it exits the vent termination. This condensate can freeze on exterior building surfaces which may cause discoloration of these surfaces. Consideration should be given to the plume of condensation that exits the exhaust which may affect the cosmetic appearance of the building.

All venting must be properly supported. The Munchkin is not intended to support any venting whatsoever. All piping, glue, solvents, cleaners, fittings and components, must conform to ASTM (American Society for Testing and Materials), and ANSI (American National Standards Institute). It is recommended that you use one of the optional vent kits specifically designed for Munchkin installa- tions, available from Heat Transfer Products, Inc. (KGAVT0601CVT [3 in.], KGAVT0501CVT [2 in.] or V500 for the T50M/T80M or V1000 for the 80M/140M/199M). NOTE: When using the KGAVT601CVT

KIT, REMOVE THE 2 SCREENS FROM THE PROVIDED INLET TEE AND INSTALL THEM IN THE INLET SOCKET AND OUTLET SOCKET (Y TEE CONNECTION) OF THE KIT PRIOR TO INSTALLING THE SCHEDULE 40 PIPE AND GLUING.

16

Page 16
Image 16
Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller manual Venting