Preparing the Site

Before you install your switch, be sure your operating environment meets the operating environment requirements in Table 4-1.

Table 4-1. Site Requirements

 

 

 

Characteristics

Requirements

 

 

Mounting

 

Desktop installations:

Provide a flat table or shelf surface.

Rack-mount installations:

Use a 19-inch (48.3-centimeter) EIA standard equipment rack that is

 

grounded and physically secure. You also need the rack-mount kit supplied

 

with your switch.

 

 

Access

Locate the switch in a position that lets you access the front panel RJ-45

 

ports, view the front panel LEDs, and access the rear-panel stacking port(s)

 

and power connector.

 

 

Power source

Provide a power source within 6 feet (1.8 meters) of the installation

 

location. Power specifications for the switches are shown in Appendix A. Be

 

sure the AC outlet is not controlled by a wall switch, which can accidentally

 

turn off power to the outlet and the switch.

 

 

Environmental

 

 

Install the switch in a dry area, with ambient temperature between 0 and

Temperature:

40ºC (32 and 104ºF). Keep the switch away from heat sources such as

 

direct sunlight, warm air exhausts, hot-air vents, and heaters.

Operating humidity:

The installation location should have a maximum relative humidity of

 

90%, non-condensing.

Ventilation:

Do not restrict airflow by covering or obstructing air inlets on the sides of

 

the switch. Keep at least 2 inches (5.08 centimeters) free on all sides for

 

cooling. Be sure there is adequate airflow in the room or wiring closet where

 

you intend to install the switch.

Operating conditions:

Keep the switch at least 6 ft (1.83 m) away from nearest source of electro

 

magnetic noise, such as a photocopy machine.

 

 

Stacking

If you intend to stack two or more switches, be sure the mounting surface

 

can safely support the switch stack. Also, be sure there is adequate space

 

around the stack for ventilation and cooling.

 

 

After confirming that your site meets the requirements in Table 4-1, you are ready to install the switch.

installation 4-2