Nokia CVT-GCU/SX manual Installation Guide for Gigabit TX/SX Tap, a signal, RX connections only

Models: CVT-GCU/SX

1 16
Download 16 pages 13.85 Kb
Page 9
Image 9
a signal...

Installation Guide for Gigabit TX/SX Tap

Connecting a GigaBit TX to SX Tap to the Monitoring Device

1. .Supply power to the Tap using the 2 redundant power supplies included with the unit. Verify that the Power LED illuminates.

2. .Using a Net Optics Custom Monitor Cable, connect the single-duplex end to the Tap Monitor Port A/B..

3. .Connect the twin-duplex end of the cable labeled DCE into the appropriate monitoring device port to monitor the DCE link. .

4.Connect the other twin-duplex end to the appropriate monitoring device port to monitor the DTE link. .

5. .Compare the LEDs on the Tap to the chart below to verify correct setup:. PWR1: Power 1. This LED illuminates (Green) when device is powered up..

PWR2: Power 2. This LED illuminates (Green) when redundancy is . powered up..

LK: Link. This LED illuminates (Green) when link is established with another device.

Tx: Transmit. This LED illuminates (Green) when UTP port is transmitting

a signal...

Rx: Receive. This LED illuminates (Green) when UTP port is receiving a

signal...

Additional GigaBit TX/SX Tap LEDs are located in the upper left and right hand corners of the RJ45 connectors for Port A and Port B..

Link Indicator: Located in the upper right hand corner. .If a good link is established, the LED illuminates a steady green. .If there is current activity on this link, the LED flashes.

Note: The SC connectors on the Custom Analyzer Cable contain

RX connections only.



Page 9
Image 9
Nokia CVT-GCU/SX manual Installation Guide for Gigabit TX/SX Tap, a signal, RX connections only