10-40 SHUT-DOWN PROCEDURE

 

1.

AFE, MINI, AND OCTO SHUT DOWN PROCEDURES

36

10-50 MAINTENANCE

 

1.

MAINTENANCE

38

2.

SEASONAL MAINTENANCE

38

3.

SEASONAL STARTUP

38

4.

UNSCHEDULED MAINTENANCE

39

5.

VACUUM VALVE TESTING

39

6.

CHECKING FOR VACUUM LEAKS

39

10-60 TROUBLESHOOTING

 

1.

TROUBLESHOOTING

42

10-70 SPARE PARTS

 

1.

SPARE PARTS

46

WARRANTY

2008-04-11

Page 4
Image 4
Nortec Industries Airfog Series installation manual SHUT-DOWN Procedure