![](/images/new-backgrounds/1119589/11958917x1.webp)
12
Page 9 of 46
Preinstallation preparation
Contents |
|
|
The following are the topics in this section: |
| |
Prepare the site | 9 | |
Unpack and inspect | 10 | |
Take inventory | 11 | |
Reference list |
|
|
The following are the references in this section: |
| |
• | Installation Planning |
|
• | System Engineering |
|
• | Power Engineering |
|
• | System Installation Procedures |
|
• | ISDN Basic Rate Interface: Product Description |
|
Prepare the site
When installing a system, address the following factors.
•environmental
•structural
•electrical
Refer to the following documents for more information.
•Installation Planning
ISDN Basic Rate Interface Installation