![](/images/new-backgrounds/1119532/11953259x1.webp)
30 Fault management | Nortel Networks Confidential |
|
|
5If a replication job is broken, then the operator must correct and reschedule the job as follows:
aTo correct and reschedule a replication job, select the DBMS Jobs tab.
bSelect the required job and click Edit. The Edit Job window opens.
cIn the Edit Job window, change the job status to Normal.
Copyright © 2003, Nortel Networks |