NuTone IM-440 Series Mounting And Connecting, Optional Door Release Pushbutton

Models: IM-440 Series

1 20
Download 20 pages 40.13 Kb
Page 11
Image 11
MOUNTING AND CONNECTING

INSTALLATION (Continued)

MOUNTING AND CONNECTING

OPTIONAL DOOR RELEASE PUSHBUTTON

You have previously prepared the master station for the optional release pushbutton.

1.Refer to Figure 24. Feed one wire from the door release transformer and one wire from the door release mechanism through the pushbutton hole in the master station panel.

FIGURE 24

2.Connect the two (2) wires to the PB1WHCL pushbutton.

3.Rotate the pushbutton so the screws are on the top and bottom as illustrated, then snap the button into the mounting hole.

CONNECTING THE MEMORY

BACK UP BATTERY

Refer to Figure 25. Connect the 2-pin plug from the battery to the connector located on the control circuit board.

2 PIN PLUG

2 PIN CONNECTOR

FIGURE 25

PLEASE NOTE

If permanent AC power has not been connected, or the AC power will be off for long periods of time, the battery should not be connected at this time. When the battery is connected, the correct time and programmed radio memory stations will be retained for approximately 30 hours on battery backup.

SECURING THE MASTER PANEL

1.Refer to Figure 26. Inspect all wiring connections to make sure they are complete and correct.

2.Make sure all antenna connections are secure.

3.Dress all remote station wires flat against the terminal board.

CAUTION

 

 

WHEN RAISING THE MASTER PANEL TO ITS FINAL POSITION, DO IT SLOWLY! BE CAREFUL NOT TO HIT OR DAMAGE ANY OF THE CIRCUIT BOARDS OR CABLES.

FIGURE 26

4.Position the master station panel over the rough-in frame and align screw holes in master with mounting brackets. Two (2) mounting holes are located behind the CD Player door.

5.Secure the master station panel to the rough-in mounting brackets with four (4) screws (provided).

NOTE: The mounting screws will pierce the wall surface behind the mounting brackets. If the wall surface is hard, a clearance hole must be drilled behind the mounting bracket before securing the master station panel.

POWERING UP THE SYSTEM

Once all connections have been completed throughout the system, it is time to apply power to the master station.

1.Apply power to the master station by turning on the circuit breaker that supplies power to the transformers in the IR-105 rough-in frame.

2.When power is first applied, the LCD display will flash 1:00 PM. Refer to the Operational Checkout section of this manual for additional information.

11

Page 11
Image 11
NuTone IM-440 Series Mounting And Connecting, Optional Door Release Pushbutton, Connecting The Memory Back Up Battery