![](/images/new-backgrounds/1166354/16635413x1.webp)
Extremely Fast and
Large Data Transfers with High Reliability.
30 | and | 9 | |
Times | Times | ||
Data Links |
|
|
|
From manufacturing recipes and information on interlocks between processes to production data, any type of data can be exchanged
at high speed and at the optimal timing. Communications performance is vastly improved over OMRON’s Controller Link and
Data Link | EtherNet/IP |
| 180,000 words…9X |
Capacity (Total) | Controller Link | 20,000 words |
|
| 8,704 words |
| |
Data Link | EtherNet/IP | 10ms | 30X |
Performance | Controller Link |
| 300ms |
(See note.) |
|
|
|
Note: Communications cycle time for 20,000 words
Automatic Address Allocation Is Expanded to Up to 240 Kwords, Enabling Allocation of Large Amounts of Data.
The memory size of the EM Area for automatic address allocation in
EtherNet/IP
CJ2 CPU Unit
Tag access
Tags are automatically allocated to the high- capacity EM Area.
Designing requires tag names only, with no need to worry about addresses.
Peripheral Devices (such as Cables, Hubs, and Wireless Devices) Can Be Used With Universal
EtherNet Technology. |
|
NEW | |
|
The convenience of a global standard at your fi ngertips.
»Using Universal EtherNet Reduces Network Installation and Wiring Costs.
»FA Wireless LAN Makes Mobile Control Easy, with No Need for Rewiring when Changing Layout.
| Host application | |
|
| Easy Monitoring with Excel |
|
| CX- Reporter |
|
| PAC Access with Visual Basic/C#.NET |
|
| CX- Compolet |
|
| Switching hub |
|
| FA wireless |
|
| LAN WE70 |
| PLC | Programmable |
Support Software | CJ1 or CJ2 CPU Unit | Terminal NS Series |
| D a t a L i n k s | Ta g A c c e s s |
F I N S M e s s a g i n g |
| |
or | ||
| ||
CIP Messaging |
| |
FTP |
| |
Time Coordination |
|
7