Optima Company 1001 installation instructions Drilling template, 2 = 22 mm 3-4-5= 15 mm 6-7= 22 mm

Models: 1001

1 32
Download 32 pages 832 b
Page 14
Image 14
Drilling template

1001

Important Note - Always use two spanners to prevent twisting of soft copper pipework on the boiler.

Flush out the water system.

Note - The maximum inlet cold water pressure must not exceed 10 bar (145 P.S.I.) and a water governor or a pressure reducing valve will be required if the pressure is in excess of 5 bar (72 P.S.I.).

Ensure all pipework is adequately supported.

Drilling template

Rear flue outlet

 

Diam. min. 118 mm

 

Upper bracket Fixing stud

Side flue outlet

 

boiler

Diam. min. 118 mm

 

 

 

Boiler = 480 mm

 

Fig. 10

Lower bracket

 

 

 

1 = Electrical cable entry

2 = Gas supply

3 = Domestic Hot Water outlet

4 = Domestic Cold Water Inlet

5 = Outlet Central Heating safety valve

6 = Central Heating flow outlet

7 = Central Heating return inlet

2 = 22 mm

3-4-5 = 15 mm

6-7 = 22 mm

 

 

 

4 Domestic Cold Water inlet 15 mm

 

3 Domestic Hot Water

5 Outlet central heating

6 Central Heating flow outlet 22 mm

2 Gas 22 mm

outlet 15 mm

safety valve 15 mm

7 Central Heating return inlet 22 mm

Fig. 11

Important Note - Always use two spanners to prevent twisting of soft copper pipework.

Note - The central heating safety valve (5) should be piped 15 mm to discharge safely outside the property.

14

Page 14
Image 14
Optima Company 1001 installation instructions Drilling template, 2 = 22 mm 3-4-5= 15 mm 6-7= 22 mm